Winter Canoe Build 04: Establishing the Footprint
September 25, 2020 - Belfast, ME
After trying a few setups, and remembering that the path of egress for the 30’ canoe must be fairly straightforward (without wanting to cut down any more trees than need be). Starting to establish the footprint here with the 2x6 pressure-treated floor sills (4ct of 20’ lengths).
Photo: Chris Battaglia